TAKE ONEGlobal Supply Enterprise Limited Start a project
Excavators in an open-pit mine
Projects & sectors

Four kinds of project. One hard question: will it arrive?

Telecom rollouts, infrastructure and mining works, hotel fit-outs and lithium battery projects each fail in a different way. The chain is designed around the failure that matters.

Sectors

What we move, and why it is difficult.

Capability descriptions below are generic to the sector. Client-specific programmes are covered under confidentiality.

Electronic circuit board01

Telecom & electronics

Network equipment, materials and spares for rollout programmes. The constraint is rarely the purchase — it is matching the delivery sequence to the installation plan while restricted electronics, including lithium batteries, move under separate rules.

We consolidate by site and by installation batch, so the equipment that is needed first is not stuck behind the equipment that ships cheapest.

  • Consolidation by installation sequence
  • Restricted electronics and battery documentation
  • Spare-parts safety stock at the hub
  • Site-level delivery scheduling
Construction workers on a large site02

Infrastructure & mining

Mining, roads and bridges: bulk materials, spare parts and heavy equipment. Cargo is often heavy, oversize and bound for a remote site with poor roads and a security profile that has to be planned, not improvised.

The chain has to survive a long clearance process and still reach the worksite door-to-door. We run heavy-duty and off-road transport with escort, and hold fast-moving consumables as safety stock.

  • Bulk, heavy and oversize cargo handling
  • Door-to-door delivery with security escort
  • Clearance for project equipment and spares
  • Safety stock for line-stopping consumables
Hotel terrace and pool03

Hospitality

Fit-out materials, equipment and operating supplies, phased to the construction and opening programme. The cargo is wide, finish-sensitive and often ordered from many suppliers against one opening date.

We consolidate across suppliers, pack for fragile and finished goods, and sequence deliveries so that installation crews are not storing materials they cannot yet fit.

  • Multi-supplier consolidation
  • Phased delivery to construction and opening
  • Fragile and finished-goods packing
  • Operating-supply replenishment
Electric vehicle charging connector04

Lithium battery & new energy

Battery materials and components, including restricted battery cargo moving under air and sea dangerous-goods rules. Documentation and packing decide whether the shipment moves at all.

Capacity is reserved in advance, and battery cargo is consolidated only where the rules allow it. The route is chosen with the classification in hand, not after the booking.

  • Dangerous-goods documentation for air and sea
  • Pre-booked capacity for restricted cargo
  • Segregated consolidation and labelling
  • Chain-of-custody visibility
Case study

Segilola Gold Mine, Nigeria

Mining is one of four project types we run. This is what a live operation looks like: 80+ categories, from engine parts to drill bits, under a hard "zero delay" requirement.

Open-pit gold mining operation
USD 450,000 Annual supply amount · since 2023

Segilola is Nigeria's first large-scale commercial gold mine, located in Ilesha, Osun State, about 120 km north-east of Lagos. It covers the full process of mining and mineral processing, with a large production scale, precise equipment and a continuous operating requirement.

Since 2023, TAKE ONE has been the cross-border supply chain service provider for the project — responsible for the full-chain supply of materials from China to the mining area.

What made it difficult
01More than 80 categories and thousands of specifications: engine parts, hydraulic accessories, high-pressure drill bits, air filters, seals, sprockets and shaft accessories; hydraulic oil, gear oil, low-temperature grease and coolant; raincoats, rain boots and protective gloves; and living supplies for the mining area.
02A long cross-border chain with concentrated risk: restrictions on electronics including lithium batteries and on large equipment spare parts, complex Nigerian customs clearance, remote mining areas, poor roads and high security risk.
03Zero tolerance on timing. A missing core spare part stops the production line, with losses counted daily — the project set a hard "zero delay" requirement.
04Demand fluctuates and emergencies are frequent: drill bits and filter elements are consumed fast, and sudden equipment failures need spare parts allocated at short notice.
How the chain was built
Centralised procurementWorking with the China purchasing centre and original factory suppliers, engines, hydraulic oil and drill bits are bought in bulk, with multi-currency settlement and procurement reconciliation in one service.
Intelligent warehousingCargo is stored in the self-owned 1,600 m² warehouse by zone — industrial spare parts, oils, safety supplies, daily necessities — under moisture-proof and anti-theft controls.
Cross-border multimodal transportAir and sea run in parallel: urgent spare parts by express air freight reach Lagos in 2–3 days, regular air freight in about 10 days, and bulk consumables move by sea. Capacity is reserved in advance for precision parts, extra-long and extra-wide parts, and lithium-battery electronics.
Direct customs clearance and deliveryA local clearance team familiar with Nigerian import policy handles release; heavy-duty and off-road vehicles with security escort run from Lagos Airport or Apapa Port door-to-door to the mining area, without transfer delays.
Digital controlProcurement, warehousing, transport, clearance and distribution are tracked in real time. Customers can check location and estimated arrival in one click. Regular supplies ship monthly in bulk, while emergency spare parts are held as safety stock at the hub warehouse.
The result
01One accountable chain from China to the mine, at USD 450,000 of annual supply since 2023.
02Urgent spare parts reach Lagos in 2–3 days; bulk consumables move by sea on a planned monthly rhythm.
03More than 80 categories and thousands of specifications handled under one purchase-order and reconciliation process.
How we start

A new project begins with a bill of materials, not a brochure.

Send the list and the date. We will tell you what can be held and what cannot.

01
Scope the cargoBill of materials, specifications, quantities and any restricted items.
02
Design the chainRoute, mode, consolidation point, clearance path and safety stock.
03
Commit and runLanded cost, delivery window, risk note — then execution with weekly visibility.

Have a project with a hard date?

Send the bill of materials and the site location. We will come back with a route, a cost and a risk note.